
|
Field |
Description |
|
Description |
The verbage associated with the selected violation code will be added to this violation. The wording can be changed for this inspection. |
|
Comply By |
The date by which the violation should be corrected will be calculated based on the inspection date and the number of days designated in the violation codes file. This date may be modified as appropriate. |
|
Closed |
The date that the violation is cleared should be entered here. Until a date is entered into this field the violation will remain open. |